Commercial lighting in Moreton-in-Marsh
Moreton-in-Marsh is a local centre in Gloucestershire. We handle LED upgrades, emergency lighting and testing, external and car park lighting and maintenance for Moreton-in-Marsh premises, with a free survey and fixed price.
Working in Moreton-in-Marsh
Moreton-in-Marsh is a local centre, covered by postcode district GL56. We regularly work across Gloucestershire, so access, parking and out-of-hours working are planned before we arrive.
Lighting services in Moreton-in-Marsh
More services across Gloucestershire
- Lighting surveys and lux testing
- Architectural and facade lighting
- Retail and shop lighting
- Commercial lighting design
- Hospitality lighting
Guide prices in Moreton-in-Marsh
Typical budgets for Moreton-in-Marsh premises, supplied and installed, excluding VAT.
| Item | Guide budget (ex VAT) | Basis |
|---|---|---|
| Annual 3-hour emergency lighting test | £130 – £410 | per visit, small system |
| LED floodlight | £205 – £510 | per fitting, supplied and fitted |
| LED high bay | £155 – £410 | per fitting, supplied and fitted |
| Emergency luminaire or exit sign | £60 – £155 | per fitting, supplied and fitted |
Rules that apply in Moreton-in-Marsh
Emergency lighting in Moreton-in-Marsh falls under the Regulatory Reform (Fire Safety) Order 2005. The responsible person must make sure people can see their way out if the power fails, and keep records of testing.
In Moreton-in-Marsh, new and replacement lighting is judged against Approved Document L, so we choose fittings with efficacy to spare and keep the evidence on file.
Moreton-in-Marsh FAQs
Do you cover all of Moreton-in-Marsh?
Yes. We work across Moreton-in-Marsh and the GL56 postcode district, plus nearby places such as Chipping Campden, Shipston-on-Stour and Broadway.
Do you remove the old fittings in Moreton-in-Marsh?
Yes. Old fittings are removed, and fluorescent tubes are recycled as hazardous waste through an authorised route, with paperwork for your records.
Which rules apply to lighting work in Moreton-in-Marsh?
Fire safety duties come from the Regulatory Reform (Fire Safety) Order 2005. For new lighting, Approved Document L sets the energy efficiency requirements. We design and certify work to BS 7671 and, for emergency lighting, BS 5266-1.
Is the price fixed?
Yes. After the survey you get a fixed price for the scope agreed. If you add to the scope later, we price the extra before doing it.