Fit-out and new-build lighting in Herefordshire

Fit-out and new-build lighting for offices, warehouses, shops and public buildings across Herefordshire. Out-of-hours working is available throughout.

Fit-out and new-build lighting in Herefordshire

Fit-out lighting is the installation of new lighting, controls and emergency lighting during a commercial fit-out, refurbishment or new-build, from first-fix containment and cabling to second-fix luminaires and commissioning. We cover Herefordshire, including Hereford, Allensmore and Bromyard.

Office fit-out in progress with new suspended LED lights installed

Fit-out and new-build lighting work in Herefordshire

We coordinate with ceiling and partition trades on Herefordshire fit-outs so first fix is done before ceilings close.

Fit-outs in Herefordshire need lighting that meets current energy rules on the day building control signs off, so we check efficacy at design stage.

What's included

  • Controls designed in, not bolted on
  • Certificates, as-fitted schedules and O&M information
  • Part L (or national equivalent) efficacy evidence for building control
  • First-fix containment and cabling, second-fix luminaires

Guide prices in Herefordshire

Typical budgets for Herefordshire, supplied and installed, excluding VAT. Your fixed price follows a free survey.

Guide prices in Herefordshire
ItemGuide budget (ex VAT)Basis
LED panel (600×600)£50 – £150per fitting, supplied and fitted
LED batten (complete luminaire)£80 – £200per fitting, supplied and fitted
Emergency luminaire or exit sign£60 – £150per fitting, supplied and fitted
DALI dimming and control£50 – £150per luminaire, on top of the fitting

Example: 80 LED fittings and 20 emergency fittings in a new office fit-out, about £5,200 – £15,000 excluding VAT.

Rules that apply in Herefordshire

Emergency lighting in Herefordshire falls under the Regulatory Reform (Fire Safety) Order 2005. The responsible person must make sure people can see their way out if the power fails, and keep records of testing.

Approved Document L (2021 edition, with 2023 amendments) asks for new general lighting to average at least 95 luminaire lumens per circuit-watt, or to use the LENI method. The 2026 edition raises this to more than 105 for work under it from 24 March 2027.

Towns we cover in Herefordshire

Fit-out and new-build lighting FAQs for Herefordshire

Which towns in Herefordshire do you cover?

All of Herefordshire, including Hereford, Allensmore and Bromyard. See the towns list on this page for local pages.

How are prices set in Herefordshire?

Our guide prices are adjusted for regional labour costs. After a survey you get a fixed price for the agreed scope.

Do you work as a subcontractor?

Yes. We can work for a main contractor or directly for the occupier.