Warehouse lighting in Ramsey
LED high bays and aisle lighting for warehouses and distribution sites. We plan lift access in Ramsey around your picking routes and loading times, so the warehouse keeps moving while the work is done.

Local warehouse lighting in Ramsey
Aisle-by-aisle presence sensing works well in Ramsey warehouses where some aisles are only visited a few times an hour.
In Ramsey distribution units the key is the optic. Narrow-beam fittings down each aisle put light on the rack faces where pickers need it, rather than on the top of the racking.
We cover the whole of Ramsey, including the PE26 postcode district, and nearby places such as Chatteris, Farcet and The Stukeleys.
Ramsey at a glance
What's included
- Lift and scaffold access planned around your operation
- Presence sensing per aisle so empty aisles dim or switch off
- Replacement of metal halide and sodium fittings and their control gear
- Loading bay, dock leveller and yard lighting
Guide prices in Ramsey
Typical budgets for Ramsey premises, supplied and installed, excluding VAT.
| Item | Guide budget (ex VAT) | Basis |
|---|---|---|
| LED high bay | £155 – £410 | per fitting, supplied and fitted |
| LED batten (complete luminaire) | £80 – £205 | per fitting, supplied and fitted |
| Presence (PIR) sensor | £40 – £80 | per sensor, installed |
| Scissor or boom lift hire | £155 – £310 | per day |
Example: 60 LED high bays in a 3,000 m² warehouse, with 3 days of lift hire, about £9,750 – £25,650 excluding VAT. Fixed price after a free survey.
Rules that apply in Ramsey
Approved Document L (2021 edition, with 2023 amendments) asks for new general lighting to average at least 95 luminaire lumens per circuit-watt, or to use the LENI method. The 2026 edition raises this to more than 105 for work under it from 24 March 2027.
In Great Britain, common T8 fluorescent tubes were caught by ecodesign rules from 1 September 2023 and the mercury exemptions for ordinary T5 and T8 lamps ended on 1 February 2024.
Ramsey FAQs
Which rules apply to lighting work in Ramsey?
Fire safety duties come from the Regulatory Reform (Fire Safety) Order 2005. For new lighting, Approved Document L sets the energy efficiency requirements. We design and certify work to BS 7671 and, for emergency lighting, BS 5266-1.
How quickly can you survey in Ramsey?
Most surveys in Ramsey can be booked within a few working days. Tell us about any deadlines, such as a lease end or a fire risk assessment action, and we will try to fit around them.
Can you work out of hours in Ramsey?
Yes. Evening, weekend and phased working is common for Ramsey offices, shops and warehouses, so the business keeps running.
What lux level does a warehouse need?
It depends on the task. BS EN 12464-1:2021 examples include 100 lux for stores and stockrooms, 150 lux at the floor of rack storage, 200 lux for open storage and loading, and 300 lux for packing and grouping.
Warehouse lighting near Ramsey
- Warehouse lighting in Chatteris
- Warehouse lighting in Farcet
- Warehouse lighting in The Stukeleys
- Warehouse lighting in Primrose Place
- Warehouse lighting in Saint Ives
- Warehouse lighting in Huntingdon