Warehouse lighting in Warminster
LED high bays and aisle lighting for warehouses and distribution sites. We plan lift access in Warminster around your picking routes and loading times, so the warehouse keeps moving while the work is done.

Local warehouse lighting in Warminster
Aisle-by-aisle presence sensing works well in Warminster warehouses where some aisles are only visited a few times an hour.
For Warminster sites with roof lights, daylight sensing can hold the high bays at a low level for much of a summer day.
For Warminster premises we plan works around opening hours, deliveries and shared access, which matters on mixed-use estates and high streets.
Warminster at a glance
What's included
- Lift and scaffold access planned around your operation
- Loading bay, dock leveller and yard lighting
- LED high bays or narrow-beam aisle fittings matched to racking heights
- Replacement of metal halide and sodium fittings and their control gear
Guide prices in Warminster
Typical budgets for Warminster premises, supplied and installed, excluding VAT.
| Item | Guide budget (ex VAT) | Basis |
|---|---|---|
| LED high bay | £155 – £410 | per fitting, supplied and fitted |
| LED batten (complete luminaire) | £80 – £205 | per fitting, supplied and fitted |
| Presence (PIR) sensor | £40 – £80 | per sensor, installed |
| Scissor or boom lift hire | £155 – £305 | per day |
Example: 60 LED high bays in a 3,000 m² warehouse, with 3 days of lift hire, about £9,650 – £25,400 excluding VAT. Fixed price after a free survey.
Rules that apply in Warminster
Approved Document L (2021 edition, with 2023 amendments) asks for new general lighting to average at least 95 luminaire lumens per circuit-watt, or to use the LENI method. The 2026 edition raises this to more than 105 for work under it from 24 March 2027.
In Great Britain, common T8 fluorescent tubes were caught by ecodesign rules from 1 September 2023 and the mercury exemptions for ordinary T5 and T8 lamps ended on 1 February 2024.
Warminster FAQs
Which rules apply to lighting work in Warminster?
Fire safety duties come from the Regulatory Reform (Fire Safety) Order 2005. For new lighting, Approved Document L sets the energy efficiency requirements. We design and certify work to BS 7671 and, for emergency lighting, BS 5266-1.
How quickly can you survey in Warminster?
Most surveys in Warminster can be booked within a few working days. Tell us about any deadlines, such as a lease end or a fire risk assessment action, and we will try to fit around them.
Do you remove the old fittings in Warminster?
Yes. Old fittings are removed, and fluorescent tubes are recycled as hazardous waste through an authorised route, with paperwork for your records.
What lux level does a warehouse need?
It depends on the task. BS EN 12464-1:2021 examples include 100 lux for stores and stockrooms, 150 lux at the floor of rack storage, 200 lux for open storage and loading, and 300 lux for packing and grouping.
Warehouse lighting near Warminster
- Warehouse lighting in Longbridge Deverill
- Warehouse lighting in Westbury
- Warehouse lighting in Frome
- Warehouse lighting in Trowbridge
- Warehouse lighting in Dinton
- Warehouse lighting in Bradford-on-Avon